Asphalt Sealcoating

  • A sealcoating job requires a minimum of 10 celsius degrees and sunny conditions for the following 24 hours. As soon as these conditions are met, the job can start. The job, depending on the shape, size, and state of the driveway, will take up to four hours maximum. We prefer starting early in the morning to let it dry as long as possible. Then, the sealant must be untouched by cars and people for 24 hours until then it can be used normally.

  • The main difference between our practices and others' is that we do it by hand. Everything from the scraping of the driveway's crevasses, the application of the sealant on the surface, the painting of the sides with a brush, and all of the cleaning is done by hand which ensures each detail to be cleaned and sealed. We are also using a sealant that is not diluted which means your driveway will stay stronger longer.

  • Although we work with most types of driveways, some might be too worn out for us to work with. If you have questions regarding this topic, write them out in our quote form and we will get back to you as soon as possible.

Next
Next

Pressure Washing